(1)
Optimization of Oxygen and Acetylene Gas Inventory Control Through Forecasting-Based ROP and ROQ Evaluation at PT Kaltim Prima Coal. jinseng 2026, 3 (`1), 48-54. https://doi.org/10.35718/jinseng.v3i`1.8481988.