PUTRI, Auliya Aisyah; KARIM, Abdul Alimul. An Analysis of Employee Productivity Measurement in the Fabrication Process in the Machining Bay Using the Stopwatch Time Study Method at PT. XYZ. Journal of Industrial Innovation and Safety Engineering, [S. l.], v. 2, n. 1, p. 16–24, 2024. DOI: 10.35718/jinseng.v2i1.769. Disponível em: https://journal.itk.ac.id/index.php/jinseng/article/view/769. Acesso em: 16 oct. 2025.