[1]
Nasywa, A. 2026. ANALYSIS OF OFFSHORE PRODUCTION MATERIAL REQUIREMENTS PLANNING USING THE MATERIAL REQUIREMENTS PLANNING METHOD AT PT. XYZ. Journal of Industrial Innovation and Safety Engineering. 3, 2 (Jun. 2026), 55–64. DOI:https://doi.org/10.35718/jinseng.v3i2.8482003.