1.
Putri D, Mahendra AP, Wirawan MK. Network Planning Analysis on Loading and Unloading of the MV Future Ocean 14,514 DWT at Semayang Port. ISMATECH [Internet]. 2025 Apr. 28 [cited 2025 Jul. 15];3(1). Available from: https://journal.itk.ac.id/index.php/ismatech/article/view/1319